A can finish a work in 10 days and B in 15 days. In how many days can they finish it working together?
Correct answer: A. 6 days
Together they do 1/10 + 1/15 = 1/6 of the work a day, so they need 6 days.
Solved quantitative aptitude MCQs on time and work, efficiency, man-days, wages, alternate-day work, pipes and cisterns and leaks, with worked solutions.
This set covers work done by two or more people, men and women working together, man-days, and pipes and taps that fill or empty a tank.
Take the total work as the LCM of the given times and work in whole units per day or hour; the explanations show this method step by step.
Correct answer: A. 6 days
Together they do 1/10 + 1/15 = 1/6 of the work a day, so they need 6 days.
Correct answer: B. 5 days
One day's work = 1/12 + 1/15 + 1/20 = (5 + 4 + 3)/60 = 12/60 = 1/5, so together they take 5 days.
Correct answer: C. 24 days
B's one day's work = 1/8 − 1/12 = 1/24, so B alone takes 24 days.
Correct answer: D. 21 days
If B does 1 unit a day, A does 2, so together 3 units a day; total work = 3 × 14 = 42 units. A alone: 42 ÷ 2 = 21 days.
Correct answer: A. 18 days
Total work = 15 × 24 = 360 man-days, so 20 men need 360 ÷ 20 = 18 days.
Correct answer: B. 20
Total work = 12 × 30 = 360 worker-days; 360 ÷ 18 = 20 workers.
Correct answer: C. 6 days
In 6 days they do 6 × (1/15 + 1/20) = 6 × 7/60 = 7/10. The remaining 3/10 takes B 3/10 × 20 = 6 days.
Correct answer: D. ₹3,000
Wages are shared in the ratio of work done per day, 1/6 : 1/12 = 2 : 1, so A gets 2/3 × 4,500 = ₹3,000.
Correct answer: A. 6 hours
Together they fill 1/10 + 1/15 = 1/6 of the tank each hour, so 6 hours.
Correct answer: B. 12 hours
Net filling per hour = 1/4 − 1/6 = 1/12, so the tank fills in 12 hours.
Correct answer: C. 10 hours
Per hour: 1/12 + 1/15 − 1/20 = (5 + 4 − 3)/60 = 6/60 = 1/10, so 10 hours.
Correct answer: D. 40 hours
Leak rate = 1/8 − 1/10 = 1/40 of the tank per hour, so the leak empties it in 40 hours.
Correct answer: A. 15 days
6 men = 10 women, so 3 men = 5 women; 3 men + 5 women = 10 women, who take 15 days.
Correct answer: B. 1/4
In one day A does 1/20 of the work, so in 5 days 5/20 = 1/4 (=0.25).
Correct answer: C. 9.5 days
Two days (A then B) = 1/8 + 1/12 = 5/24. After 8 days (4 pairs) 20/24 is done, leaving 4/24 = 1/6. Day 9 is A's: he does 1/8 = 3/24, leaving 1/24, which B finishes in half a day (1/24 ÷ 1/12). Total 9.5 days.
Read detailsCorrect answer: D. 12 days
Total = 10 × 8 × 12 = 960 man-hours; 8 men × 10 hours = 80 man-hours a day, so 960 ÷ 80 = 12 days.
Correct answer: A. 20 minutes
Two-thirds of the tank is still empty: 2/3 × 30 = 20 minutes.
Correct answer: B. 3 days
In 4 days A and B do 4 × (1/12 + 1/24) = 4 × 1/8 = 1/2. The remaining 1/2 at 1/12 + 1/24 + 1/24 = 1/6 per day takes 1/2 ÷ 1/6 = 3 days.
Read detailsCorrect answer: C. 12 minutes
Together: 1/20 + 1/30 = 1/12 of the tank per minute, so 12 minutes.
Correct answer: D. 12 days
B does 1.5 times as much work a day as A, so B takes 18 ÷ 1.5 = 12 days.